INFRASTRURE OF THE VIDYALAYA

The vidyalaya is proud to have adequate resources both human and non-human to fulfill the objectives of the Samiti. The vidyalaya administration is taking due care to utilize these resources in the most befitting manner for the optimum productive output.

The table below shows the details of the infrastructure of the vidyalaya.

STATUS OF INFRASTRUCTURE IN JNV’S

I Area of land allotted (in acres)

Whether land transferred in the Name of Samiti

Vidyalaya shifted to permanent buildings on

: 30.45 Acres

: No

: 01/04/1994

ii Status of Boundary Wall

a. Brick Wall

b. Barbed wire fencing

Total completed 2263 meters of brick wall
iii Permanent buildings constructed : (CBRI pattern)
iv School building : Completed
v Dormitories

: Boys 01 No.

: Girls 0.75 no.

vi Kitchen/dining Hall

No. of shifts required for all students to take food

: Completed, Area 703 sq. mtrs each of one kitchen and two dining halls.

One shift.

vii Principal Residence :01 No.
viii Staff Quarters

 

 

Type III = 16 Nos.

Type II = 12 Nos.

Type I = 02 Nos.

SP Sheds converted into Staff Qrs.: 10 Nos.

ix M.P. Hall : Available
x Workshop : Available
xi Type of O.H. Tank

Its capacity

Present Status

: Column based

: 100000 litres

: Working satisfactory

xii U.G. tank

Its capacity

Present Status

: 100000 litres

: Working satisfactory

xiii D.G. Set : Available

: Kirlosker make

: 10 KV

: Working

: Year of procurement: 10/04/1994

xiv Sewage Pump : 5 H.P.
xv Water Pump : 3H.P.-4 nos., 10 H.P.-2 nos.5H.P.-2nos.
xvi Electrification

Electric connection

Sub Station building

Street lighting

Numbers of hrs. during day when power supply is available on an average.

 

: Rural

: Complete

: 30 Nos.

: 20 hrs.

xvii Playfields

400 metre track

40 x 30 metre basket ball court

40 x 30 metre volley ball court

: Not available

: 02 Nos. – Available

: 02 Nos. – Available

xviii Water supply

Tube Well

Hand pump

Connection from PHED

: Potable, 02 Nos.- working

: Potable, 10 Nos.- working

: NO

xix Rajiv Gandhi Smriti Van : Available
xx Fire fighting arrangement : Working (Mess, Library and laboratories)
xxi Last date of cleaning of

(a) Septic tank

(b) Water tanks

:10/05/2008

:25/10/2007

xxii Whether area around transformer is fenced : No
xxiii Whether open wells, if any, are covered from top : Yes
xxiv Works taken up under M&R fund during current year and last year:- :

Year

Name of work (M&R)

Expenditure

(Rs. In lacs)

Cumulative expenditure during the year

2007-08 W/Wash, C/Wash, Painting etc. Rs. 293588.00 Rs. 293588.00
2007-08 Repair/Replacement of doors Rs. 26361.00 Rs.319949.00
2007-08 Repair/Replacement of sanitary fittings(W.C. Sheets, Traps, S.W sheets) Rs. 1158.00 Rs.321107.00
2007-08 Repair/Replacement of w/supply fittings(Valve,pipe, tap etc.) Rs. 2046.00 Rs. 323153.00
2007-08 Purchase of electrical Items Rs. 40064.00 Rs.363217.00
2007-08 Electrical Works Rs. 7581.00 Rs.370798.00
2007-08 Repair/Replacement of broken glass Rs. 1371.00 Rs.372169.00
2007-08 Cleaning of campus, OHT, Sep. Tank Rs. 12469.00 Rs.384638.00
2007-08 Rennovation of Play Ground, flooring of class rooms etc. and other repair works Rs. 96438.00 Rs.481076.00
2007-08 GRAND TOTAL:   Rs.481076.00

   

Details of vehicle provided to the Vidyalaya
(i)

Whether vehicle is provided or not (Yes/No)

YES
(ii)

Description to vehicle.

MM 540 Jeep
(iii)

Model no and date of purchase.

MM 540 Jeep, February 1988
(iv)

Present condition of the Vehicle.

Good working Condition